The Service Director, Democratic Services and Communication provided the Cabinet with the recommendations of the Climate Change Cabinet Steering Group, which considered a report on the current situation with regards to the Taffs Well Spring Renewable Energy Project.

 

The Service Director informed the Cabinet that at their meeting on the 18th December 2019, the Steering Group were provided with a detailed PowerPoint presentation, which sought to explain the background to the project, the proposed way forward and the cost implications. The Steering Group were particularly pleased to learn that the current expected core project was expected to save 37.1 tonnes of CO2 and agreed to recommend to Cabinet the approval of the project.

 

The Leader and Deputy Leader took the opportunity to thank the Steering Group for their work and the Local Member for pushing forward such a positive project.

 

It was RESOLVED:

1.    To note the content of the report considered by the Climate Change Cabinet Steering Group on the 18th December 2019 and;

2.    To approve the next steps of the project.

 